Theme: Blue and Green Theme: Blue and Green Theme: Red Theme: Green
Background: 1 Background: 2 Background: 3 
 
 
 
 
Last Update: 17 10 2019
Version 8.2.2
 

Kuching Water Board wished to inform consumers that it would be carrying out pipe connection work of 400mm DI pipe at Jalan Stutong from 10.00PM on Tuesday, 17 September 2019 to 5.00AM on Wednesday, 18 September 2019

Consumers at along and around Tabuan Jaya Baru Phase 1, Tabuan Jaya Baru Phase 2 off Jalan Stutong and all surroundings area will experience low water pressure or water supply interruption during the said period. Consumers are therefore advised to be prepared for the said occasion.

The Board regrets for any inconvenience caused to our consumers. All efforts will be made to restore the water supply back to normal in the fastest time possible.