Kuching Water Board wished to inform consumers that it would be carrying out pipe connection works at Mile 10 of Jalan Kuching/ Serian from 10.00PM on Thrusday, 11 April 2019 to 5.00AM on Friday, 12 April 2019. The said pipe connection work will be postponed to the following day if the wether condition does not permit.

Consumers along from Mile 9 to Mile 16 Siburan Jalan Kuching/ Serian, Mile 16 Siburan to JBALB water supply area, Jalan Kuap, Sri Arjuna Booster Station Mile 10, Jalan Landeh, Jalan Puncak Borneo and JBALB water supply area  all of the surrounding area may experience low water pressure or water supply interruption during the said period. Consumers are therefore advised to be prepared for the said occasion.

The Board regrets for any inconvenience caused to our consumers. All efforts will be made to restore the water supply back to normal in the fastest time possible.