Theme: Blue and Green Theme: Blue and Green Theme: Red Theme: Green
Background: 1 Background: 2 Background: 3 
 
 
 
 
Last Update: 8 12 2019
Version 8.2.2
 

Kuching Water Board wished to inform consumers that it would be carrying out pipe connection work of 300mm DI pipe at Jalan Landeh from 9.00AM to 4.00PM on Friday, 20 September 2019

There will be no area affected, as it is using the under pressure tapping. But onsumers are therefore advised to be prepared for the said occasion.

The Board regrets for any inconvenience caused to our consumers. All efforts will be made to restore the water supply back to normal in the fastest time possible.